The new Russian-made heavy dump truck "BAZ-S32A5" was presented at the Comtrans-2024 exhibition in Moscow. It is produced by JSC "Romanov" at the former MAN plant in the Leningrad region.
The Telegram channel "No Limits" notes that the heavy dump truck has a 6x6 wheel arrangement and can handle a road train of up to 110 tons. The cab, frame and axles of the dump truck are produced in Russia and Belarus, with some"Miass automakers" helping with its localization.
The "heart" is a YaMZ-653.1 engine with a power of 367 hp and a torque of 1800 Nm. It allows the dump truck to travel at a speed of 70 km/h even on very bad roads.
The vehicle type approval for the "BAZ-S32A5" will be received in May 2025. The base cost of the heavy dump truck starts at 20 million rubles, and it will not be affordable for all interested parties.
Therefore, the company is in the process of signing an agreement with the Ministry of Industry and Trade on compensation for the purchase of the "BAZ-S32A5" - this is how they hope to reduce the price and not remain at a loss.
Read materials on the topic:
Navio Company presented the Russian unmanned tractor L5
Russian racing truck "Valdai Sport" shown in Moscow
Russian tractors "Valdai 45" are being converted into cement trucks due to a shortage of wagons
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation
Articles
-
Russian An-124 "Ruslan" Stuck in Canada for 4 Years and Accrues Millions in Fines
26 Jan 2026
-
Coaxial Propellers: How Counter-Rotation Increases Turboprop Engine Efficiency
25 Jan 2026
-
Kazan Aviation Plant Breaks Old System: Tu-214 to be Assembled Like Cars
25 Jan 2026
-
How Engineers and Technicians Are Paid Today in the Russian Aviation Industry: An Overview with Figures
24 Jan 2026