The development will allow drones to stay in the air for up to 3.5 hours
Angara's ATC also trained specialists in the maintenance of Mi-8 helicopters and An-24/26 aircraft
The enterprise will increase the level of localization in engine building to 83.2%
The vessel will be launched in 2026
The operation of the machines was checked at the Kuban MIS
The Project 11442M ship has been under repair since 2013
The project is being implemented by Sistema Corporation in collaboration with MTS PJSC
The works will be carried out on a section of the highway from Zelenograd to Vysokovo
Charging complexes will start operating in 2026
Mass production of the device will be launched in 2025
The drone can stay airborne for up to 24 hours
The cost of building one vessel in Russia is 12.5-16.5 billion rubles
These messages contain a link to a file in .vcf format
The next asteroid, 2025 FA22, will pass by our planet in the second half of September