Universal row-crop wheeled tractors UMG T2204 and UMG T2604 of the Bryansk Tractor Plant were tested at the Kuban State Zonal Machine Testing Station (Kuban MIS) of the Ministry of Agriculture of the Russian Federation. The machines confirmed their purpose in performing tillage and transport operations.
Tractors T2204 and T2604 significantly exceeded the standard for operating time before failure. Instead of the minimum required 400 hours, they worked without failures for 610 and 1010 hours, respectively.
UMG T2204 and T2604 tractors can be used by agricultural producers, crop and livestock farms to perform various agricultural operations with mounted, semi-mounted and trailed implements, as well as to perform auxiliary and transport operations in the agro-industrial complex.
The key advantages of the machines include unpretentious engines adapted to the conditions of Russia. In combination with a spacious fuel tank (500 l) and a mechanical synchronized transmission with 16 forward and reverse gears, it allows you to perform operations with a high degree of efficiency and economy.
Earlier www1.ru reported that the new Tuman 4 sprayer tractor was presented at the exhibition of the Zhigulevskaya Dolina technopark.
Read materials on the topic:
MTZ specialists are assembling the first BELARUS-5022 tractor with a capacity of 500 "horsepower"
Now on home
The company expects to reach the world level
"Kaponir" was launched at the Sredne-Nevsky Shipbuilding Plant
Units jointly use "Molniya-PVO" interceptors and mobile radar stations
After Traffic Growth and Overtaking YouTube, the Service is Transitioning to a Paid Model
The payload of the spacecraft will reach 500 kilograms in low orbit
Free and paid plans with different levels of access are being considered
Aviation Expert Borisov: The Main Advantage of the Il-114-300 is That It Already Exists
The upcoming geomagnetic storm will be weak
Integration will expand the capabilities of the on-board digital platform
The main function of such rockets is to replace retiring satellites from satellite constellations
Cooling tower foundations are 43% complete