
Russian Nuclear Icebreakers Receive Fully Domestic Control System
The "Okean 22220" complex monitors a thousand parameters

The "Okean 22220" complex monitors a thousand parameters

They autonomously plan routes, clean floors, navigate obstacles, and return for charging

VNIIT engineers simulate a load of 120 kN and stop a train in 90 seconds

The equipment prepares explosives directly at the work site - it's safer and faster than traditional methods

The "Moscow 2.0" project vessel is designed for 140 passengers and can operate for up to 20 hours in hybrid mode

Automotive plant engineers carried out "marinization" of the truck engine and achieved full replacement of the foreign component

The new 36-ton machine from UMG combines record-breaking range and remote control capability

TMH continues to supply new generation trains for the capital's subway

The vessel of project 05074A "Volzhsky" was built in 1997

The Project 23470 vessel is being built in St. Petersburg by order of the Russian Ministry of Defence

Sections of the passenger vessel were manufactured at the Yaroslavl Shipyard

After three years of field tests, the domestic unit proved: ours work no worse than foreign ones

Direct power transmission reduces losses and increases machine efficiency up to 85%

Foreign units for the SVP-50 became unavailable due to sanctions

Train movement on the section completely suspended