
Tugs and Icebreakers: Around 20 Vessels to be Built for Rosmorport by 2028
The main order will be fulfilled by shipbuilders of the Onezhsky Shipbuilding and Ship Repair Plant

The main order will be fulfilled by shipbuilders of the Onezhsky Shipbuilding and Ship Repair Plant

Head of the Ministry of Economic Development assessed the pace of assembly and the construction of a new complex

By the end of the year, the corporation will present possible solutions to the market

The main market for Belarusian equipment remains the CIS

The vessel is designed for icebreaking operations on the Neva River

The horizontal module is being developed based on YaMZ-777

The system will be able to operate even from an unprepared coast

The Project 498 "Saturn" vessel was decommissioned in 2023

The liner, designed for 292 passengers, will be able to sail in ice for a month without calling at ports

The logging machine's payload capacity is 14,000 kg

Russian river-sea vessel projects may be in demand in Latin America

Non-resource export directive requires new vessels, not just gas carriers

The quay wall will be extended, and the warehouse area will occupy 38.5 hectares

The benefit should level the playing field with traditional transport and accelerate industry growth

Fines up to 600 thousand rubles will no longer be issued for liquid "sloshing" in tanks