
Russia to Increase Ship Production by More Than 10 Times by 2030
Their number should increase to 638 in the next five years

Their number should increase to 638 in the next five years

The displacement of the vessel of the TSVP-60 project is 201 tons

New material made of copper and tungsten withstands extreme temperatures and radiation

The plant will be located in the Esipovo Industrial Park

The owner changed on December 12 last year

Ammonia is Supplied to the Part at a Temperature of 850°C

The samples have already passed tests for frost resistance, wear resistance, strength, and durability and are ready for use in cities

The sanctions package is being prepared for more than a hundred tankers, oil traders, insurance companies, and individuals

Three-year work on medical equipment for cancer treatment completed in collaboration with Tomsk Polytechnic University and Research Institute of Oncology

The plant will increase its output by almost 20% thanks to multi-million investments

KB "Spektr" will be able to produce 1000 sets of propellers per month

The station site in Hungary is already ready for pouring the first concrete

The project will be implemented in the next 15-20 years

Its lightness, strength, hardness, and heat resistance make it indispensable in the defense industry, aircraft construction, rocket engineering, electronics