
Akkuyu NPP Completes General Rehearsal of Fuel Loading Before Reactor Start-up
163 dummy fuel assemblies were manufactured in Novosibirsk and do not contain nuclear materials

163 dummy fuel assemblies were manufactured in Novosibirsk and do not contain nuclear materials

New mechanism simplifies design and ensures smooth operation

Authorities Introduced an Hourly Schedule to Ensure the Operation of Emergency Services

Six agreements on air safety and a contract for municipal equipment signed

Equipment will be repaired in the field without transfers

A manipulator with a vacuum gripper transfers trays from the conveyor to shipping boxes faster than a human

Production volumes are about 100 cars per day instead of the promised 200 due to difficulties with components, claims insider KhaDm

The mixture does not cool down from the plant to the trench

TES gas stations will only dispense fuel to communal services and ambulances

Domestic Machine to Replace Slovenian KEKO CAM-C35

The shape reduces heat loss and wind load, while CLT panels make the structure five times lighter than reinforced concrete

New system adapts processing speed in real time and reduces the risk of tool breakage

The first batch will be ready by autumn 2026

The corporation's enterprise will participate in management and expertise