
New Drilling Equipment Plant of TOFS, Successor to Baker Hughes in Russia, Opens in Tyumen
The production is designed to produce 700 units of equipment per year

The production is designed to produce 700 units of equipment per year

Modern equipment will increase production and improve production safety

Alternating voltage of the complete busbar - 1000 V

The substance is necessary for cleaning electronic components

The new ship is designed to carry a wide range of cargo

Bakanov: Communication terminal is ready, now we need to make a satellite device

The ship is designed for 300 passengers and can withstand waves up to 3.5 meters high

Seven inventions were patented during the development and manufacture of the reactor

The engines may be installed on Lada Azimut and other cars of the manufacturer

Rosatom will continue cooperation with Hungary

Russia consumes about 3,000 tons of REM per year

24 high-capacity power units are in the active implementation stage

The power plant is based on the YaMZ-537 engine

Batteries made using AGM technology are resistant to voltage fluctuations and function stably in a wide temperature range

Specialists performed heat treatment, non-destructive testing, and monitoring of welded joints, ensuring the reliability of the structure