Cost reduction may occur with increased production volume, the state corporation stated
Aircraft certification tests will be completed in August 2026
The cost of the aircraft has increased to 7.6 billion rubles
The cost of the Il-114 aircraft will be 2.6 billion rubles due to price recalculation
By 2030, Half of Russian Airlines' Aircraft Must Be Made in Russia
The aircraft will be handed over to the airline "Aurora" at the end of 2026
Half of the SSJ-100 flights are made between Moscow and St. Petersburg as part of the "Shuttle" program
Modern materials are used for the manufacture of power plant parts