
Passengers may be forced to chip in for MC-21, Tu-214, and SJ-100
Authorities are still working on a mechanism that could bring in up to 84 billion rubles per year

Authorities are still working on a mechanism that could bring in up to 84 billion rubles per year

The airport's ground handling service received certification to service the airliner back in 2023

Aeroflot will receive 90 aircraft from 2029 to 2032

The price should drop below 7.5 billion rubles due to serial production, optimization of manufacturing, and expansion of the supplier network

New domestic CNC device will bend aluminum and titanium into complex profiles

Hollow shear bolts-pins should break at a pre-calculated point, moving the strut away from the wing with fuel tanks

The model checks reactions to lightning strikes and engine failure before aircraft assembly

The Irkutsk Aviation Plant is revising production procedures before reaching an output of 15 aircraft per year

The aircraft still needs to prove its readiness in Russia, but Rosaviatsia is already looking at its foreign routes

The official oversaw flight operations, airworthiness maintenance, and certification of the MC-21, Tu-214, and Il-114-300

The model accounts for microdamage accumulation and gradual reduction in material stiffness and strength

MS-21, SJ-100, Il-114, and Tu-214 may be followed by the export of individual systems, technologies, and production competencies