In Petropavlovsk-Kamchatsky, on November 6, an incident occurred at the shipyard pier during the launching of the border patrol boat PSKA-287 of Project 1496, belonging to the Coast Guard of the Border Service of the FSB of Russia.
The vessel, which was being repaired on the shore, suddenly lost stability and capsized into the water. Several people were overboard, but thanks to the prompt actions of personnel and rescuers, no one was injured.
The very next day, specialists from the ship repair company and representatives of the Coast Guard carried out an operation to straighten the boat and put it on an even keel. According to preliminary data, a commission is being created to investigate the causes of the incident.
Technical characteristics of project 1496:
- gross tonnage - 58.6 tons;
- deadweight - 14.7 tons;
- displacement - 107.6 tons;
- overall length - 23.46 m, constructive - 21.46 m;
- overall width - 5.73 m;
- board height - 2.6 m;
- ship draft - 1.857 m;
- fuel reserves - 8 tons;
- freeboard - 0.743 m.
Earlierwww1.ru reported that "Admiralty Shipyards" will complete the icebreaker "Dzerzhinsky" of project 23550.
Read also materials:
Now on home
Almost half of Russian citizens have felt the impact of neural networks on their memory, attention, and thinking
The vehicle with ADR approval is equipped with a 482 hp engine and a robotic transmission
Strongbox will equip the interiors of the helicopter carriers Vasily Trushin and Vladimir Andreev
FSB prevented illegal export of technologies in St. Petersburg
Thanks to a new method, cells "switch" and begin to fight the tumor
Foreigners are patrolling the skies in the region as part of the Baltic Air Policing mission
The Ministry of Defense Demanded Another 722 Million Rubles from the Enterprise
Wind tunnel tests will help athletes reduce air resistance
The mechanism is proposed to be implemented through "Gosuslugi" or MFC
Engineers from PNRPU, together with colleagues from China and Saudi Arabia, have developed a computer model that will save wells from collapse
The fifth-generation combat aircraft has been delivered to the Algerian Air Force
Reasons include high Central Bank rate, rising costs, and shortage of server equipment due to AI