It is planned to expand the territory on Russky Island by 0.57 hectares. The new area will be used in winter for parking icebreakers and storing their spare parts. The corresponding project was published on the official legal information portal of the city of Vladivostok.
According to the documents, as part of the large-scale restoration of the object, soil from the rocks will be poured into the water near berth No. 6. A warehouse, treatment facilities will be built on the new site, and lighting systems will be installed. Work will also be carried out to strengthen the banks to prevent their destruction.
Water for construction needs is planned to be taken from the city water supply, while dirty water will not be discharged into the water area, but will be taken to the city's treatment facilities. Thus, the construction should not affect the ecology of water bodies.
The icebreakers "Kapitan Khlebnikov", "Moscow", "Saint-Petersburg" and the tugboat "Emar", as well as the icebreaker "Kapitan Dranitsyn", now owned by "Rosmorport", will be able to moor at this site.
Authorities claim that without the construction of this site, the icebreakers will not have a place to park, which will lead to an increase in government spending on their maintenance.
Earlier www1.ru reported that a new Russian radar for satellite systems has been tested on board an aircraft.
Read more materials:
- Lunar reactor: Earth's satellite may become the first space platform for nuclear energy
- Nuclear reactors will become stronger: a new type of industrial ceramics has been developed in Russia
- The possibility of building gas turbines of the GTE-300 type is being studied at the Power Machines enterprise
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation
Articles
-
Russian An-124 "Ruslan" Stuck in Canada for 4 Years and Accrues Millions in Fines
26 Jan 2026
-
Coaxial Propellers: How Counter-Rotation Increases Turboprop Engine Efficiency
25 Jan 2026
-
Kazan Aviation Plant Breaks Old System: Tu-214 to be Assembled Like Cars
25 Jan 2026
-
How Engineers and Technicians Are Paid Today in the Russian Aviation Industry: An Overview with Figures
24 Jan 2026