The future train for the high-speed railway (HSR) will run on the route without a machinist. This was announced by the head of Russian Railways, Oleg Belozerov.
The train will be unmanned in the future, highly automated, ultimately unmanned. And this train will be controlled by artificial intelligence, which we also know how to develop. Moreover, it is currently working for us.
According to the head of the railway company, more than 20% of all new developments by designers for the creation of a high-speed train have been tested and are ready for production.
We are actively conducting certification and moving forward.
Welding of the first train for the first branch of the HSR (Moscow–St. Petersburg) will begin in September 2025. About 150 enterprises were involved in this.
Read materials on the topic:
Su-57, "Baikal" and SJ-100 decorated the Moscow metro train
Now on home
Hard and dense shot ensures the destruction of the target from the first hit, regardless of the drone's body material
Almost all body elements are zinc-treated
SOGAZ lost the case in court against UEC-UMPO
A rare SUV with a mileage of 38,533 km is offered for 2 million rubles
The government has included passenger and cargo airships among the key transport technologies of the future
Moscow sent 43 containers of weapons, including ATGMs and sniper rifles
There is a need to increase air traffic within Russia and abroad
Lada Niva Travel with a new 1.8-liter engine tested at temperatures of -25 and -30 °C
Производить первую энергию планировали ещё в апреле 2025 года
Retail is in second place, and education and medicine are in third place
The basic version of the system is capable of hitting targets at a range of up to 300 km
Security forces challenged the legality of yachting entertainment