The "City Cruise-1" ship of project 04240 has started operating on routes along the small rivers and canals of St. Petersburg. It is designed for excursion transportation of passengers. This was reported by the press service of the company "Neva Travel".
The vessel's design has been adapted for operation on the city's small rivers and canals. This allows it to successfully pass under low bridges.
The "City Cruise-1" ship is another step in the development of our excursion fleet. Every year we gradually update its composition: we design and build new catamarans of the "Kotlin" and "Sommers" projects, this year we launched winter navigation on "Snezhok" hovercraft for the first time, and now we are happy to present the long-awaited replenishment of the single-deck fleet.
The second vessel of project 04240 is planned to be put into operation during the 2025 navigation season.
Technical characteristics of "City Cruise-1" project 04240:
- Length — 21.8 m.
- Overall width — 5.58 m.
- Displacement — 40.21 t.
- Maximum speed — about 12 km/h.
- Passenger capacity — 90 people.
- Crew — 2 people.
Earlier www1.ru reported that the first catamaran of project 04710 "Sommers" for tourist transportation was launched in St. Petersburg.
Read materials on the topic:
The third high-speed catamaran "Fort Alexander I" left the slipways in St. Petersburg
Moscow received all electric vessels from the Emperium shipyard
Environmentally friendly and fast: five river routes will appear in Moscow by 2030
Now on home
The reason for indexation may be inflation, an increase in VAT, and rising production costs
The Ministry of Industry and Trade believes that the increase in the levy will not affect responsible manufacturers
Экипаж разогнал лайнер до 580 км/ч вместо крейсерских 450 км/ч
Ship equipment comes to Russia from China at inflated prices
Almaz-Antey and the Belarusian Ministry of Defense signed a contract for equipment maintenance
The complex's computing resources allow for the competent distribution of targets between launchers
Among the spacecraft are Aist-2T No. 1 and No. 2
Deputy Prime Minister Novak announced a postponement of the deadlines, but confirmed the commitment to developing the sector
Design engineers without experience are promised salaries from 80 thousand rubles
Hard and dense shot ensures the destruction of the target from the first hit, regardless of the drone's body material
Almost all body elements are zinc-treated
SOGAZ lost the case in court against UEC-UMPO