Construction of the main monolithic structures has begun at the Lipovaya Roscha station of the Rublevo-Arkhangelsk metro line. The works are being carried out at a depth of 24 meters outside the Moscow Ring Road, where almost 150 thousand cubic meters of soil were previously extracted. The station complex will include a platform, installation chambers, and reversing sidings for trains.
An anchor method using sheet pile walls 22-30 meters long was used to secure the excavation pit. This technology made it possible to complete the work in one stage, reduce time, and reduce labor costs. This method is possible precisely because of the remote location of the station: in the city center, long anchors could damage underground utilities.
In July, Moscow Mayor Sergei Sobyanin and Moscow Region Governor Andrei Vorobyov launched the construction of a double-track tunnel from Lipovaya Roscha to Stroginо station. After commissioning, the station will become the third in the Moscow region.
The Rublevo-Arkhangelsk line will connect the Moscow City district with Rublevo-Arkhangelskoye and Krasnogorsk. Transfers to the MCC, Solntsevskaya, Filevskaya, Arbatsko-Pokrovskaya, and Big Circle metro lines will be available on it.
Read materials on the topic:
HSR Moscow - St. Petersburg included in the project of the future Moscow metro scheme
"Train of the Future" - a new themed train was launched in the Moscow metro
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation