Samara University named after Korolev has announced the launch of a new computing complex designed to analyze data from the SPD experiment at the NICA collider. The development was carried out in partnership with the Joint Institute for Nuclear Research in Dubna.
The SPD experiment aims to uncover the mysteries of the spin properties of elementary particles. To do this, researchers will collide beams of protons and deuterons with spin polarization to better understand their internal structure and the nature of spin.
A computing cluster consisting of 300 nodes has been deployed for the needs of the experiment. This cluster will become a key element of the distributed data processing system. Samara University has been actively involved in the project since 2021.
Experts emphasize that this project proves the possibility of independently developing computing systems for scientific institutions. The launch of the cluster will allow the university to efficiently process and store experimental data.
NICA is a superconducting collider of protons and heavy ions. The accelerator complex is being created to study the field of particle physics in a previously inaccessible area of parameters and experimental conditions: obtaining intense beams of heavy ions and polarized nuclei in order to search for a mixed phase of nuclear matter and study polarization effects in the energy region.
Read more materials:
Phase input and hyperspectral analysis: Samara scientists have improved the photon computer
Single-board computer based on the SKIF processor developed by Elron LLC
Now on home
Foreign delegation visited the "Parus electro" electrical equipment manufacturing plant
"The new system is more powerful than the existing version"
Sergey Marzhetsky stated that placing orders in the DPRK could become a realistic solution under sanctions
NDTV: India Aims to Acquire 40 Combat Aircraft
The autonomous platform can travel up to 60 km
Casting technology allows creating elements with geometry that cannot be obtained by other methods
The manufacturer promises compliance with global safety and quality standards
Remterminal to establish rolling stock production by 2032
Inside - Sleeping Places for Four, Shower, Toilet, and Hot Water
The device is equipped with BAM-OS 18×55 gas cylinders with red hot pepper
Almost 70% of cars in the country have exceeded the 10-year mark
The complex will start operating as early as 2026