Rosatom Corporation has completed the first stage of developing the "WIZARD-RDM" software package, which will become the technological basis for creating a digital twin of radiochemical production. This was reported by the holding's press service.
The new version of the virtual radiochemical plant will allow assessing all stages of spent nuclear fuel (SNF) reprocessing, analyzing the composition and quantity of reagents, waste volume, parameters of technological operations, and specific characteristics of radiochemical processes. Based on the collected data, the system will help optimize SNF reprocessing technologies and methods for handling radioactive waste (RAW) at the development stage and during operation.
This is an important project for Russian science, as there are currently no twins of radiochemical production facilities needed to improve the efficiency of creating and further operating closed nuclear fuel cycle facilities.
The technological digital twin will also allow scientists to abandon "manual" calculations and minimize the risk of errors in the implementation of real projects. Currently, the main vision of the new version of the software package has been developed, including approaches to calculation algorithms and requirements for its structure. The completion of this work will pave the way for software development.
Earlier, www1.ru reported that Rosatom and Softline are joining forces to digitalize the industry.
Read materials on the topic:
Rosatom will continue to prepare power units for launch in Bangladesh and Turkey in 2025
"Alice, subscribe to www1.ru": "Yandex" will supplement its voice assistant with an AI agent
New Rosneft software will accelerate gas field research without stopping production
Now on home
The company switched to the Yadro technology stack to improve server management
The complex remained on the KamAZ-6560 chassis and is capable of using two types of anti-aircraft missiles
Over the past 5 years, 140 thousand km of roads have been built and repaired in Russia
The surcharge for the 4x4 hybrid version is 305 thousand rubles
Plans to Improve Verification Procedure on "Gosuslugi" Portal
The Lipetsk Mechanical Plant updated the ventilation system of the hull production
The development reduces the activation energy of thermal decomposition by 25%
"Lenmorniiproekt" has started searching for contractors to carry out the work
Tests of Wire for Tokamak Electromagnetic System Conducted for the First Time
The plant's new components feature reduced noise and high meshing accuracy
The holding acquired 258 electric locomotives and 141 diesel locomotives
The aircraft with hydraulic cylinders and a rotary wing design will be able to carry up to 40 people