Years of research and development work commissioned by the Ministry of Defense of the Russian Federation have resulted in significant financial losses for the Novator Design Bureau in Yekaterinburg, which is part of the Almaz-Antey Air and Space Defense Concern.
The military pointed to the disruption of deadlines and obtained a ruling in the Arbitration Court to recover 650 million rubles from the Ural bureau. At the same time, representatives of Novator denied direct guilt, noting that in 2021 they were presented with an addition to the technical specifications, after which a number of already completed works had to be redone.
The court sided with the Ministry of Defense, which presented other claims to the Design Bureau. Representatives of Almaz-Antey preferred to remain silent regarding the conflicts.
The state-owned JSC \"Air and Space Defense Concern Almaz-Antey\" is one of the largest enterprises in the defense industry, producing air defense equipment, including the latest S-500 Prometey anti-aircraft missile system.
Earlier www1.ru reported that the engine cowling of a Superjet-100 was torn off in mid-air.
Read more materials:
Newest missiles for anti-aircraft and tactical systems developed in Russia
Military installed a new 107-mm MLRS on the chassis from \"Bukhanka\" UAZ-3303
Kalashnikov handed over another batch of AK-12 assault rifles to the military
Now on home
Modernization based on the BAZ-69092 all-terrain vehicle with a 6×6 wheel arrangement increased the vehicle's range and speed
Phone scammers are hunting for potential MFI clients
A material that usually decomposes for hundreds of years has proven vulnerable to insects
The power unit uses 24 centrifugal-pneumatic nozzles
The taxi of the future is already on Russian roads
The flagship sedan will soon be sent for testing
The model did not meet the plant's expectations due to low consumer qualities
In the future, a patrol boat and a pilot boat will be built from the same material
Autonomous locomotive provides traction for trains weighing up to 7,100 tons
The design capacity of the station will reach 410 MW of electrical and 1389 Gcal/h of thermal energy