The multi-purpose subsonic tactical missile LMUR ("Product 305") of the air-to-ground system, which received the X-39 index, has been modernized for the Russian military. The munition is designed to destroy weapons depots, protected fortifications and command posts.
The missile is equipped with an increased warhead. The previous launch mass of the X-39 was 105 kg, and the current one is unknown. The missile is equipped with a multispectral optoelectronic homing head with infrared sighting channels, an autopilot and a two-way communication system with the carrier.
The missile is capable of operating in two modes. The first provides for the independent flight of the X-39, after which the operator finds the target and takes it for escort. In the second, the search and capture of the target is carried out even before it is dropped from the carrier, and after separation, the missile operates on the "fire and forget" principle.
The maximum launch range is 14.5 km. The missile was built in a cylindrical body with a diameter of 200 mm and a length of less than 2 m. The launch weight is 105 kg, of which 25 kg falls on the high-explosive fragmentation warhead. The solid-propellant rocket engine will allow the missile to accelerate to 230 m/s. The X-39 carriers are the Mi-28NM "Night Superhunter" and Ka-52 "Alligator" helicopters.
Earlier www1.ru reported that the painting quality of Lada Iskra SW Cross has been revealed.
Read also materials:
The newest X-UAV missile for drones is waiting for modernization: combat power will increase
Now on home
Russian Navy submarines are equipped with torpedoes that break through the ice
LMS-901 Will Improve Connectivity of Territories in the North and Far East
The enterprise will supply interior solutions for train cars and driver's cab blocks
The first 200 drones have already been handed over to the military
Military pilot Popov: "in the next 50 years, the priority will remain with manned aviation"
MWM: 84 Aircraft to Receive New Radars and Possibly AL-41F-1S Engines
Andrey Patrakov: Russia had no groundwork for stratospheric drones
The machine will operate as part of recovery trains
Experts will determine the types, volumes, and list of components for mandatory verification
Work on the vessel of project Р-1039 must be completed by December 23, 2026
Experts call the project the most complex: nanometer measurement accuracy is required
The decoy flies out first, followed by a 105mm projectile