Novocherkassk Electric Locomotive Plant (NEVZ, part of Transmashholding) will manufacture a new 2ES9 main freight electric locomotive. This was reported by the company's press service.
The manufacturing of the 2ES9 main freight electric locomotive is scheduled for 2025, with testing planned for July. Currently, the development of design documentation and technological preparation of production are underway.
The electric locomotive is planned to be used on the Eastern Polygon to haul trains weighing 7,100 tons at a speed of 120 km/h. The model will be equipped with an asynchronous traction drive.
The chassis will be unified with other Transmashholding locomotives - theTE30 platform diesel locomotives. A unified three-axle bogie is being created for both projects.
Earlier, www1.ru reported that "Elmashremont-Chelyabinsk"started repairing engines for 2ES4K and 3ES4K "Donchak" freight electric locomotives.
Read more on the topic:
New Russian inclinometers created at IRNITU - they can work for a year without recharging
From 25% to 50%: Russian animal husbandry and poultry farming hooked on equipment imports
Now on home
The service contains data on 45,000 fraudulent sites
The state has accelerated the introduction of unmanned solutions, integrating them into the real sector of the economy
Modernized engines may equip the Lada Azimut crossover
The price is 132 billion 265.8 million rubles
The manufacturer plans to strengthen its lineup of light commercial vehicles
The production of carbon fiber was organized in the shortest possible time
Electric vans will speed up the repair of urban transport infrastructure
Countries are working to synchronize regulations in the field of AI
The service's average daily audience is 55 million people
Stable Isomaterial Based on Metakaolin Has a Density Below 300 kg/m³
Re-identification quality improved twofold with new DynaMix method
Russians will be able to find out about debts online