The number of harmful particles depends on water purification, not the bottle material
The number of harmful particles depends on water purification, not the bottle material
The solution will allow drones to recognize objects and bypass obstacles without human intervention
12 blocks weighing 12 tons each were lifted to a height of 7.85 meters
Two reactors of 175 MW each, breaks three-meter ice, versatile for sea and rivers
The machines received powerful engines and a bucket with an increased volume
The solution will speed up assembly and simplify the installation of onboard equipment
Blue Sky Pro light lenses generate radiation that mimics the spectrum of the morning and evening sun
Domestic innovative development with a continuous work cycle will increase the speed of track repairs
Experts completed an important stage before fuel loading and physical start-up of the reactor in 81 hours
The device converts the kinetic energy of airflows into electrical energy
The PR-30/35 turbine from the Kaluga plant was accelerated to 3000 rpm and prepared for the next stage of testing
PANDA has launched the production of specialized elevators for industry
The height of the structure is 2.5 meters, and its total weight is 25 tons
The "Superjet" underwent special testing: approaches to landing with go-arounds were practiced, and the stall warning system was tested.
The model developed by specialists from GosNIIAS simulates the work of the crew, taking into account stress, fatigue, and level of training
The Governor of the Khabarovsk Territory announced plans to build from four to eight units of equipment
Sprinklers and drift eliminators will help turn the water flow into millions of droplets for rapid heat exchange