
Sevmash assembled two sub-blocks for the floating dock "Sukhona"
The new structure will be able to lift 23.5 thousand tons. The structure will transport vessels between the slipway hall and the shipyard water area

The new structure will be able to lift 23.5 thousand tons. The structure will transport vessels between the slipway hall and the shipyard water area

The new method of identity verification is already being tested on three routes

"Kaponir" was launched at the Sredne-Nevsky Shipbuilding Plant

The 75-ton machine will replace imported equipment in diamond mining

The development of the SITC of the Ministry of Transport will determine flood zones and risks for traffic in real time

The vehicle with ADR approval is equipped with a 482 hp engine and a robotic transmission

Berdex Company Plans to Assemble Up to 60 Units of Equipment per Year

The new aviation hub in Karachay-Cherkessia will improve the transport accessibility of one of Russia's main mountain resorts

Yandex devices are being tested in two medical institutions in the capital

Hardening, grinding, and magnetic inspection are the stages that determine the reliability of the engine