
«Vasily Ilyin» hovercraft built in Russia
Passenger vessel of project PM44 created at the "Soaring Machines" shipyard

Passenger vessel of project PM44 created at the "Soaring Machines" shipyard

Vestibule Decorated in Marine Style to Open in 2025

The capacity of the three charging complexes will be 150 kW

The Shoner T-150K can operate at temperatures from -40°C to +40°C

The technical features of the engine facilitate the start of the tractor in cold weather

Robot dogs have already been tested at stations in the Moscow region

"Sura 2.0" is the first passenger vessel to receive an autonomous control system from GC "Gama"

The manufacturer is the Transmash plant

User verification will be carried out through the Unified Transport Portal

The project includes 700 berths for vessels

The remaining elements of the tanker will be used to repair other vessels

The motorcycle has only 3 thousand km on the odometer

The project is planned to be implemented by the summer of 2025

Buses can withstand temperatures down to minus 50°C

Contract Value Increased from 10.5 to 17.84 Billion Rubles