
Russian Railways plans to launch unmanned trains on new routes
The third level of automation provides for the driver to be in the cabin

The third level of automation provides for the driver to be in the cabin

New models ZiD-125, ZiD-250, and ZiD-300-01 cost up to 220 thousand rubles

Special markers for precise train movement have already been installed on the Big Circle Line

Project 81365T-MEV tanker lifted onto slipways

The Ministry of Transport will build a sufficient base for implementing technologies across the country

Belarusian special equipment is equipped with a climate control system and is suitable for operation in Siberian frosts

The municipal equipment's lifting capacity is 800 kg

The algorithm will be tested on the two-section electric locomotive 2ES10 "Granit"

The new LHD received a 480 hp engine, reinforced frame, and electronic control systems

The 11-car train has an increased number of seats, a coffee machine, and a refrigerator added

Special equipment is equipped with foreign Lifan and Kubota engines

Digital design tested on BELARUS-3525 model