The works were performed by the multi-bucket dredger Kuban-2
The works were performed by the multi-bucket dredger Kuban-2
The second T2 line connected the east and south with an interval of six minutes on "Vityaz" and "Lionok" trams
A unique 380 Ah power unit is assembled entirely from Russian components and is ready for installation on trains
The project has already been launched in Khimki, Lyubertsy, Odintsovo and Dolgoprudny
The new structure will be able to lift 23.5 thousand tons. The structure will transport vessels between the slipway hall and the shipyard water area
The new method of identity verification is already being tested on three routes
"Kaponir" was launched at the Sredne-Nevsky Shipbuilding Plant
The 75-ton machine will replace imported equipment in diamond mining