Engineers recorded record figures and continue to increase the pace of development of hydrogen systems
Engineers recorded record figures and continue to increase the pace of development of hydrogen systems
The latest rescue vessel of project NE025 confirmed the Arc4 class and joins the Arkhangelsk fleet to work in Arctic conditions
Three companies appealed to Minister Anton Alikhanov with a letter to preserve financial assistance
Production of up to 2,000 vehicles per year is planned
Vessel of the Mariner-1000 project will perform the first depth measurement in the port of Temryuk
Updated equipment will increase throughput by 40%
The design speed of the rolling stock is 160 km/h
The heavy floating crane is capable of lifting loads up to 700 tons
SuperHouseBoat Baikal 50 is geared towards passengers with high and ultra-high income
Mass production at KMZ is scheduled to begin in 2027
Special equipment will replace a team of 5 utility workers
Vessel of project 19910 passed sea trials
Production of gondola cars has already begun
34 Rosmorport icebreakers will ensure accessibility to 16 freezing seaports
Passenger seats will become more comfortable due to the absence of metal joints