Energy workers checked the generator for turning gear operation
Energy workers checked the generator for turning gear operation
The Ministry of Defense Demanded Another 722 Million Rubles from the Enterprise
AI analyzes the correctness of element installation and identifies defects
"Kronshtadt" blames high Central Bank rates for the financial situation
Hardening, grinding, and magnetic inspection are the stages that determine the reliability of the engine
"RT-Okhrana" won a lawsuit against TANTK named after Beriev
Alexander Dergachev heads NPO Mashinostroyeniya
At BSU, they bypassed the main conflict of metal at the micro level
Installation with a long flight life will make it possible to visit other planets
Experimental cassettes with chromium coating loaded into the Balakovo NPP reactor
The complex will specialize in the transshipment of dry fertilizers
The cost of work at three facilities was estimated at 117.1 billion rubles
Deliveries of power plants are scheduled for 2028
The briquette contains more than 90% iron, which makes it suitable for the production of high-quality steel in electric arc furnaces