
Russian 130 nm lithographer prepared for acceptance tests
Technical specifications for the next 90 nm resolution unit have already been prepared

Technical specifications for the next 90 nm resolution unit have already been prepared

Two more launch vehicles are planned to be equipped with such solutions in 2027

The airflow from the fan is proposed to be directed through a turbine and an asynchronous generator

The case has been under consideration since March, with a Rusal group enterprise as the defendant

The head of the state corporation linked the growth to new products, technological sovereignty, and increased efficiency

PNRPU methodology tested on three typical gas turbine engine elements and implemented at ODK-Aviadvigatel

135 m of pipeline was cleaned with superheated steam before commissioning the equipment

At the Bougouni deposit, Inferred resources increased 1.5 times - to 458 thousand tons of lithium carbonate

The Severodvinsk plant is building submarines of projects 955A "Borei-A" and 885M "Yasen-M"

AI workloads will account for about 70% of the increase, and the share of the Moscow region may decrease to 51%

At the Irkutsk Aviation Plant, aircraft parts undergo automatic chemical treatment

During impregnation, the mold remains open, and then closes to compact the reinforcing package

The horizontal structure, over 22 meters long, is designed for a slow-speed turbine

Materials foam up during a fire and fill the space around engineering utilities