
Rosatom Approves Construction Timeline for Primorskaya NPP: First Power Unit to Launch in 2033
NPP will provide 2 GW of capacity as part of the Primorsky Territory development strategy

NPP will provide 2 GW of capacity as part of the Primorsky Territory development strategy

The containment consists of 12 "petal blocks"

Three more productions are located on the territory of the plant - wind power plants, pipelines and valves

The largest contribution was made by the oil and gas, mining and energy industries

Production of marine equipment has been localized in Russia to a sufficient extent

New project of "Omsk Rubber" will reduce dependence on imports in the chemical industry

The agreement, concluded within the framework of SPIEF, is aimed at developing industrial infrastructure, localizing technologies and supporting exports

The model is equipped with a modern new generation transmission

The President instructed to establish the production of dual-use products

Joint venture between "Red Soft" and Passion is preparing a line of devices based on the Russian OS

An agreement was signed at SPIEF between the leadership of the city on the Neva and St. Petersburg State University on the creation of a large scientific and industrial cluster

All aircraft components will be created on domestic machines

"Ufaneftekhim" to Receive 255 Million Rubles from the Enterprise as Compensation for Expenses Incurred During the Construction of Workshops and Buildings

Budgetary and extra-budgetary funds will be directed to the development of satellite systems, manned spaceflight, and reducing launch costs.

The construction of the station in Hungary was expected to begin in 2025