Translated with AI from the Russian original.

The Arbitration Court of St. Petersburg and the Leningrad Region terminated the proceedings on the recovery of 77.3 million rubles from the St. Petersburg JSC "ODK-Klimov" on the claim of the Perm company "Reduktor-PM". The justification for the requirements was not specified.

The case was considered at a closed court session, as a result, representatives of "Reduktor-PM" abandoned the claims against the engine builders.

Recall that "ODK-Klimov" is part of the United Engine Corporation. The company builds TV7-117 power plants for Il-114-300, VK-2500 for TV3-117 and electronic automatic control systems.

JSC "Reduktor-PM" specializes in the production and after-sales service of helicopter gearboxes and transmissions.

The company produces, repairs and maintains the main gearboxes and transmission units of helicopters of various modifications: Mi-8/17, Mi-28, as well as Mi-26T.

Read more materials on the topic:

Never miss our newsAdd this site to your preferred sources to see us more oftenAdd on Google

Now on the front page