Rosatom is resuming the implementation of the large uranium project "Bolshoi Elkon," which will provide the Russian nuclear industry with raw materials for hundreds of years to come. According to the industry newspaper "Strana Rosatom," citing Yuri Trubakov, Deputy Director for Strategic Development of the Elkon Mining and Metallurgical Combine (EGMC), the company is starting to revive the project, which was frozen after the Fukushima nuclear accident.
EGMC was established to develop the Northern and Southern sections of the Elkon uranium ore region in Yakutia. Currently, gold is extracted from the mined ore at the Northern deposit in pilot operation mode: 700 kg were obtained in 2024, and the plan for 2025 is 1.4 tons. By the end of next year, the enterprise will be put into commercial operation, and from 2027 it will produce about 3 tons of gold annually.
At the same time, the combine is preparing additional exploration of the Northern and Druzhnoe deposits based on the recommendations of the State Commission on Mineral Reserves. After the approval of permanent conditions, the active phase of the "Bolshoi Elkon" project will begin.
By 2036, the company plans to process up to 2.5 million tons of ore and produce about 2 thousand tons of uranium per year. Balance reserves of 357 thousand tons will provide the industry with uranium for at least 140 years.
Read more:
- Small targets - big threat: SAM system "Pantsir-S" can shoot down drones the size of 30 by 30 cm
- KAMAZ-53193 confirmed efficiency: the prototype of the hydrogen truck "Chistogor" reduced fuel consumption during tests
- Rostec showed in Venezuela the "Aurora" and "Antison" systems that increase road safety
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation