Russia plans to develop high-speed transportation technologies, including Hyperloop vacuum trains, within the next 10 years. These plans are outlined in the materials of the Russian government for the strategic session "Development of high-speed transport communication (rail and roads)."
Alternative technologies will also be developed in the next 10 years. For example, magnetic levitation technologies, train movement in a vacuum environment (Hyperloop).
A maglev (magnetic levitation) train has been successfully operating in Shanghai on the route from the airport since 2004. China is also creating a locomotive that reaches speeds of up to 600 km/h. It will reduce travel time between Beijing and Shanghai from 5.5 to 2.5 hours.
In addition, a line is being built in Japan between Tokyo and Nagoya, with a length of over 280 km, where the expected speed will be 500 km/h. A train has been developed for this project. In 2015, it set a world speed record of 603 km/h. The completion of the line is scheduled for 2034.
Earlier www1.ru reported that the Aurora will be included in the Russian Book of Records.
Read materials on the topic:
No need to wait: trains on the HSR-1 between Moscow and St. Petersburg will run every 15 minutes
Museum locomotives in Russia began to be used for retro trains
HSR Moscow-St. Petersburg will receive 41 high-speed trains from GTLK
Now on home
Certification Progress of Wide-Body Aircraft Estimated at 15%
The SUV is powered by three electric motors
Biomorphic robots from NIIAS are being tested at stations in the south and the Urals
Deputy Svintsov stated that the messenger is interacting with the country's authorities
Soviet "corncobs" are offered for 1.2 to 1.5 million rubles at the start of trading
The National Library of Russia will have to settle for domestic products
Thanks to American modules, communication with the operator remains uninterrupted
The equipment eliminates errors made by humans
The company switched to the Yadro technology stack to improve server management
The complex remained on the KamAZ-6560 chassis and is capable of using two types of anti-aircraft missiles
Over the past 5 years, 140 thousand km of roads have been built and repaired in Russia
The surcharge for the 4x4 hybrid version is 305 thousand rubles