The Arbitration Court of Moscow has granted the claim of the Ural Locomotives plant against Siemens Mobility. The reason for the claim is the refusal of a Siemens subsidiary to supply equipment for Lastochka electric trains.
Claim to be fully satisfied
Ural Locomotives demanded that the company's refusal to fulfill its obligations to supply and maintain equipment be declared invalid, and also to recover from Siemens Mobility a penalty for late delivery of equipment kits in the amount of more than 25.4 million rubles.
The Ural Locomotives plant (part of the Sinara - Transport Machines holding) is one of the leading enterprises in Russia in the field of mechanical engineering. It specializes in the design, production and maintenance of new generation traction and multiple unit rolling stock, and also creates equipment for passenger and freight transportation.
Earlier www1.ru reported that the acceptance of the new eight-car electric train ES104 Finist has been completed.
Read materials on the topic:
Head of Russian Railways: a fully unmanned train will be launched in Moscow in 2026
Russian Railways will purchase almost 900 domestically produced cars in 2024
Successfully replaced Lastochka: ES104 Finist electric train launched in the Perm Territory
Now on home
The main purpose of the development is to store and supply working fluids to the pipelines
Combat vehicles transformed into APCs with serious drone protection
"ODK-Klimov" Reduces Financial Claims Against Kazan Helicopter Plant
Russian scientists have recorded a fresh flare zone in the south of the Sun
Army's "Boomerang-10" Implements Target Acquisition Function
The price of the aircraft without engines starts from 233 million rubles
The operation takes only 12 seconds per wheel
The power unit is installed on patrol and border boats
KAMAZ-740 V-shaped diesel and KAMAZ P6 six-cylinder engine are being considered as options
All 20,000 Pieces Were Purchased with Funds from Concerned Citizens