A new Tu-214 aircraft with serial number 535 was painted at the Minsk Civil Aviation Plant. It became the first new airliner of the series built in three and a half years.
The footage published online shows that the aircraft was painted in white and brown tones. The registration number of the aircraft can be seen on board — RA-64535. The aircraft arrived for painting in Minsk on February 24 and flew back to Kazan on March 10.
The aircraft was built for the Ministry of Industry and Trade of the Russian Federation as a VIP aircraft. It became the first Tu-214 to take to the air in three and a half years.
Thus, at present, 35 Tu-214 aircraft have been built at the Kazan Aviation Plant (KAZ), and the total number of Tu-204/Tu-214 family aircraft built in the USSR and Russia since 1989, together with prototypes, amounted to 91 units.
Read more on the topic:
Rostec will start growing parts for an advanced aircraft engine
It became known when the serial production of Russian engines for An-124 "Ruslan" will begin
The Ministry of Industry and Trade cancels the simplified technical regulations for the automotive industry from 2025
Now on home
Герой России Гарнаев: никто из профессионалов о возобновлении производства на КАЗ всерьёз не говорит
Система отслеживает спутники на высотах до 50 000 км и ведёт за ними наблюдение
The armored vehicle is equipped with a KamAZ-740.35-400 diesel engine with a power of 400 hp.
Constant improvements in avionics, weapons and tactical capabilities will make the aircraft a flexible response to future challenges
The exterior of the KamAZ-54901 features fairings on the cab and chassis for fuel economy
Fighters are in demand both domestically and abroad
Tyazhpromexport and Venezuela Agree on Plant Revival
The company not only completed the state order, but also quickly mastered the production of AK-12K for special forces
Experts have developed a photogrammetric complex with a resolution of less than 1 cm