Mooring Trials of Cutter Suction Dredger for Rosmorrechflot Begin in Astrakhan

Technical vessel of project 93.159 is being built at the "Lotos" production site

Employees of the "Lotos" production site of the Southern Shipbuilding and Ship Repair Center (part of the United Shipbuilding Corporation, USC) in Astrakhan have begun mooring trials of a cutter suction dredger (project 93.159). This was reported by the corporation's press service.

Trials of dredger project 93.159
Trials of dredger project 93.159

The technical vessel is being built under a contract with the State Transport Leasing Company (GTLK) for Rosmorrechflot. This is the third dredger out of four of project 93.159, which are being built in Astrakhan.

The plant's specialists will check the functionality of the ship's life support system mechanisms, engines, communications equipment and electronics. 
USC Press Service

They will test the lifting mechanisms, fuel systems and cooling systems. Then tests of the propeller-rudder complex with control from the wheelhouse will begin.

<br>
<br>

The dredger is designed for dredging works. The vessel is propelled by two independent azimuth propulsion units (the executive part of the main ship power plant).

The first two dredgers of project 93.159 were put into operation in 2023 and 2024. Currently, the vessels operate in the Volga and Dvina-Pechora basins.

Characteristics of project 93.159:

  • Length - 50 m
  • Width - 11.88 m
  • Board height - 2.97 m
  • Average draft with full fuel supply - 1.3 m
  • Soil extraction depth - 10 m
  • Productivity - 900 m³/hour
  • Speed - 12 km/h 

Read also on the topic:

Two dredgers of project 2040 will be built by Rechflot specialists under the order of GTLK

USC continues active construction of dredging fleet

900 cubic meters of soil per hour: dredger "Severo-Dvinsky-901" completed dredging in the Astrakhan region

Источники
OSK

Now on home