The strategic nuclear-powered missile cruiser "Karelia" of Project 667BDRM "Dolphin" will complete repairs at the Zvezdochka Ship Repair Center and go to sea for testing in 2025, according to Vladimir Maltsev, head of the All-Russian Fleet Support Movement (DPF).
According to him, the active zone was replaced on the "Karelia", and the ship is currently undergoing dock repairs.
The submarine will remain in service until 2038. It will remain armed with 16 Sineva intercontinental ballistic missiles. Currently, two submarine crews are undergoing training at the training center in Obninsk.
The R-29RMU2 Sineva is a three-stage liquid ballistic missile for third-generation submarines with a sequential arrangement of stages. The warhead can be equipped with four small-sized high-speed unguided warheads with a capacity of about 500 kt each. The maximum range depends on the throw-over weight and can exceed 11 thousand km.
Characteristics of Project 667BDRM:
- Greatest length - 167.0 m
- Greatest width - 11.7 m
- Average draft - 8.8 m
- Displacement - 18200 m³
- Working immersion depth - 400 m
- Maximum immersion depth - 650 m
- Full underwater speed - 23 knots
- Full surface speed - 13 knots
- Crew - 140 people
- Autonomy - 90 days
Earlier,www1.ru reported that a batch of the latest T-90M tanks with the Kalina fire control system hadentered the Russian Armed Forces.
Read the materials on the topic:
Cat and mouse: Su-34NVO pilots avoided interception by a Patriot PAC-2 GEM-T SAM missile
One shot - one target hit. Footage of the operation of unique Vikhr aviation missiles has appeared
Now on home
The material withstands loads up to 106 MPa and is suitable for bridges, roads, and heavy equipment
The complex combines air defense and electronic warfare systems into a single loop and responds without human intervention
The medical device was developed by specialists from the Samara Medical University
The new RGT facility allows for the complete restoration of key hot section components
Engineers solved the main problem of the section - mixed soils, where clay alternates with rocky formations
Pacific Fleet conducted exercises in the Sea of Japan with electronic launches
The first launch is scheduled for 2029, and fire tests are scheduled for 2027
Alternative messengers do not yet provide the same reach and convenience
The project has already been launched in Khimki, Lyubertsy, Odintsovo and Dolgoprudny
The app shows the route step by step, even if the geolocation fails