Russian Defense Minister Andrei Belousov, during a conference call with Russian Presidential Aide Alexei Dyumin, pointed out that there is currently a need to streamline and coordinate the supply of individual property to the front, especially electronic warfare and reconnaissance equipment.
According to him, the regions of Russia provide great assistance to the troops in matters of supplying equipment and hardware. This refers to the purchase and supply of drones, "trench" electronic warfare equipment, wheeled vehicles, body armor elements, and other equipment directly to the units.
The head of the Russian military department outlined the need to carefully consider the proposed mechanisms of interaction and use them in organizing assistance to the troops.
Belousov noted that this will help avoid excessive variability of products at the front and increase the efficiency of the technical means supplied by the regions.
Earlier, the head of the state corporation "Rostec," Sergei Chemezov, stated that with "garage" production of drones in Russia, it will not be possible toachieve the release of the required number of devices.
Read materials on the topic:
Deadly "Berezhok": combat module B05Ya01 adapted to fight kamikaze boats
Now on home
Start of deliveries scheduled for 2027
Over 51,000 new motorcycles were sold in Russia in 2025
The car will take at least a year to assemble
The application's audience has reached 20 million users
The model will be included in the list of cars for taxis, price - from 2.25 million rubles
All parking lots of the "Administrator of the Moscow Parking Space" are connected to the service
The cars will be supplied to the Moscow Transport Service Directorate
Deliveries to India may begin in 2028
The technology provides automated search for all types of defects in power units
The plane flew 500 km, accelerating to 425 km/h
The plant stated that the information about the termination of purchases for models 6 and 8 is not true
Scientists are using the "Ekran-M" installation
Articles
-
Russian An-124 "Ruslan" Stuck in Canada for 4 Years and Accrues Millions in Fines
26 Jan 2026
-
Coaxial Propellers: How Counter-Rotation Increases Turboprop Engine Efficiency
25 Jan 2026
-
Kazan Aviation Plant Breaks Old System: Tu-214 to be Assembled Like Cars
25 Jan 2026
-
How Engineers and Technicians Are Paid Today in the Russian Aviation Industry: An Overview with Figures
24 Jan 2026