
Production of trains for the high-speed rail line has reached 65% readiness: the complex buildings have stretched to 420 meters
Equipment is being installed and rails are being laid in the assembly shops in Verkhnyaya Pyshma

Equipment is being installed and rails are being laid in the assembly shops in Verkhnyaya Pyshma

A total of 26 vessels for cargo transportation along the Northern Sea Route are in the order portfolio

The vessel of project 13490 "Kamchatka Shelf" is designed for receiving and processing fish

New Domestic Thrusters with a Capacity of 2000 kW Withstood 160% of Torque

Full manual control and fuel economy are the main advantages of the new gearbox

The contract amount for retrofitting the technical fleet vessel of project CSD 650 is more than 32 million rubles

"GlavSevmorput" Opens Logistics Headquarters in Chukotka Port to Ensure Navigation in the NSR Waters

Project 03141 Developer - SK Viking

Photo fixation data for 15-20 minutes reveals the moment the flow transitions to an unstable state

Vehicles with a capacity of over 70 people will cover the need for transporting employees from remote areas

The dry cargo ship R2-RSN (4.5) will become the basic project of the new line: deadweight up to 7,820 tons, speed 10.3 knots

The complex can see even small hiding places among tens of tons of cargo

Uniform requirements for the identification number are introduced, similar to VIN for wheeled vehicles

Over the year, specialists checked more than 2.1 million units and found defects in 1,300 of them