
5576BY-H-3 truck crane on MAZ-6302S5 chassis from "Mogilevtransmash" showcased at an exhibition in Moscow
Lifting capacity at full outreach - 950 kg

Lifting capacity at full outreach - 950 kg

The hydrofoil will operate on the Perm - Chaykovsky route with stops

The Arc5 ice-class platform, developed by OSK specialists, has potential for further development

The structure will withstand trains at 400 km/h, tests are equivalent to 50 years of service

The average age of such vessels is 49 years; only 57 new ones have been built in 25 years

"Klipper" and "Briz" will be able to transport containers along Northern Delivery routes

The train received an exclusive Belarusian design

The development of the Northern Sea Route will require 164 new ships by 2035

The project includes a 350-meter dry dock and a 50-thousand-ton floating dock

The diesel-electric vessel will accommodate up to 140 passengers

The autonomous vessel will help conduct geodesic and engineering measurements

Ministry of Transport Prepares Regulatory Framework for New Delivery Method

The new component combines three functions in one housing

The Western Transport and Logistics Hub is moving to Murmansk, and the concept is changing to focus on export-import transportation

Six of them will be flagship, but on M-11 the service station project has already been deemed unprofitable