The facility includes a workshop, warehouses, a gas station, and storage areas for equipment
The facility includes a workshop, warehouses, a gas station, and storage areas for equipment
The DTA-460T bi-fuel unit has a power of 460 kW and weighs 2.2 tons
Lifting capacity at full outreach - 950 kg
The hydrofoil will operate on the Perm - Chaykovsky route with stops
The Arc5 ice-class platform, developed by OSK specialists, has potential for further development
The structure will withstand trains at 400 km/h, tests are equivalent to 50 years of service
The average age of such vessels is 49 years; only 57 new ones have been built in 25 years
"Klipper" and "Briz" will be able to transport containers along Northern Delivery routes
The train received an exclusive Belarusian design
The development of the Northern Sea Route will require 164 new ships by 2035
The project includes a 350-meter dry dock and a 50-thousand-ton floating dock
The diesel-electric vessel will accommodate up to 140 passengers
The autonomous vessel will help conduct geodesic and engineering measurements
Ministry of Transport Prepares Regulatory Framework for New Delivery Method
The new component combines three functions in one housing