"Valdai 45R" Project 23180 to Establish Connection Between Balakovo, Engels, and Saratov
"Valdai 45R" Project 23180 to Establish Connection Between Balakovo, Engels, and Saratov
The boat is equipped with a 115 hp engine.
Mass production of power units will be launched in 2026
Welding of the first train will begin in September 2025
"Cosmonaut Pavel Popovich" of project 23160 type "Cometa120M" will run on the route until October 1
It is planned to use 160 thousand tons of rail products
The locomotive assembly will be completed in August 2025
The train will run on the Nizhny Novgorod - Moscow route on December 3, 2025
The cars have 40 seats, showers and individual climate control
The vessel of project 3050.1A is designed to service floating and stationary navigation marks, monitor fairway depths, and escort barges with a carrying capacity of up to 400 tons
The new diesel locomotive is 90% assembled from domestic components
More than 150 enterprises will participate in the project implementation
Vessel of project 04240 adapted for operation on small rivers
The cars are equipped with USB connectors and ultraviolet lamps for disinfection
The issue is under review, but no specific tightening of the rules is currently being considered