
No more than 0.20 microsieverts per hour: Radiation control system for El Dabaa NPP to be developed by NPP "Doza"
It will take up to 4 years to design and manufacture equipment for 4 power units with VVER-1200 reactors

It will take up to 4 years to design and manufacture equipment for 4 power units with VVER-1200 reactors

Specialized vehicles will ensure safe movement of radioactive waste

The equipment was manufactured by specialists from NPP Doza