
First hybrid liner for Lake Baikal to be built for 2.7 billion: TFRF 700 project vessel to be launched by 2028
Hull sections will be manufactured at the Perm Shipyard

Hull sections will be manufactured at the Perm Shipyard

The complex integrates all measuring equipment and collects data from production to shipment

The Ministry of Education and Science will coordinate the creation of unified requirements for supercomputer centers and access to them for science and industry

The complex will produce products for 5G, aviation, and electric transport

The enterprise will master the casting of steering wheel frames from magnesium alloy and the sewing of materials

Siberian scientists used VEPP-3 and VEPP-4 synchrotron radiation to develop a gradient coating of iron, tungsten, and molybdenum

Mooring equipment has been installed on the vessels, watertightness tests have been conducted

By 2028, the company plans to assemble up to 40,000 devices annually

A joint group of developers, commissioned by the state, is making a replacement for Keysight and AWR

Units with a capacity of 15.6 kW will go to specialized systems performing strategic tasks

The enterprise will be able to assemble large-sized structures

The shipyard is preparing to build heavy ice-class vessels with a displacement of up to 10,000 tons

State Expert Review Board approves construction of a 10,000 m² facility at "Perm Motors"

Rosatom scientists have made it more resistant to emergency situations

Grossi called for ensuring the safety of the Zaporozhye NPP and the Bushehr plant under construction in Iran