
ODK prepares for a major upgrade of the GTD-110M turbine: service life to increase to 125 thousand hours
Engineers will also simultaneously reduce unit emissions and simplify maintenance

Engineers will also simultaneously reduce unit emissions and simplify maintenance

The enterprise failed to complete the final stage of work on creating gas-discharge video modules

High-power gas unit, designed to replace foreign analogues

The supplier failed to fulfill the contract for the supply of equipment for tunnel thrusters

The 16GDG unit will allow the locomotive to transport 7100 tons of cargo and operate without power unit replacement for up to 40 years

The machine lifts up to 600 kg

The 179-meter structure will be the second tallest in St. Petersburg after "Lakhta Center"

The design uses rotors that rotate in opposite directions to increase operational stability

The problem is most acute in aviation and power engineering

The automated device will be used for educational purposes

A giant foundation for the construction of the containment building has been prepared for power unit No. 4

The invention reduces the weight of the structure and increases its reliability

The Ministry of Digital Development is looking for ways to accelerate the implementation of domestic solutions in enterprises

Ural Aluminum Company claims 27.8 million from UVZ for raw materials

Designer Chikunov: MiG's pragmatic approach may disappear from Russian combat aviation