
"Rechvodput" received 2 buoy tender vessels of project 3050 from KMZ
6 such vessels were built in 2024

6 such vessels were built in 2024

The winch frame is made of high-strength low-alloy steel

Equipment Demonstrated Stable Operation

The compressor is used to supply facilities with high-pressure compressed air

The equipment will be installed on a backup power source for nuclear power plants

Water-jet engines can accelerate the boat to 85 km/h

KMZ development is being installed on Afalina boats

The main feature of the model is the absence of a toe and shock absorber on the crankshaft

"KMZ Cargo" delivers goods along the Northern Sea Route

The equipment is also suitable for installing the Main Circulation Pump of the unit

The production site will appear in 2025

The device can help the Russian military in offensive operations in the sea and river area

The equipment is designed for fastening and remote release of a towing rope

The project involved specialists from FSUE "NAMI" and PJSC "KAMAZ"

The holding's employees completely overhauled 2 diesel engines