The railway system of the Krasnodar Territory has been fully restored and is ready for normal train traffic after the abnormal snowfall that hit the region before the New Year. This was reported by the Committee of the North Caucasus Railway (SKZD).
In the Krasnodar Territory, the operation of transport infrastructure facilities damaged on December 31 as a result of abnormal snowfall has been restored.
In the region with the introduced state of emergency, the power supply of the contact network and the automated train control system were successfully restored. More than a thousand railway workers worked to eliminate the consequences of bad weather in the Kuban.
In late December 2025, Kuban and Adygea faced a powerful cyclone that left many households without light and heat before the New Year. Residents had to sleep in outerwear, and there was a shortage of gasoline and clean water in stores. 100 emergency and repair crews were involved in the restoration of infrastructure.
Read more materials on the topic:
- Emergency mode on the railway of the Krasnodar Territory: details of the incident due to abnormal snowfall
- Railway crane for complex construction and restoration tasks developed in Chelyabkranservis
- Russian Railways plans to allocate 120 billion rubles for the HSR-1 "Moscow — St. Petersburg"