Gorky Automobile Plant (GAZ) switched from a 4-day to a 5-day work week in October, the company's press service reported.
The decision is related to the temporary stabilization of demand — in September, the Ministry of Industry and Trade of the Russian Federation provided a 20% discount under the preferential leasing program, which made it possible to partially sell accumulated stocks of finished products and slow down the rate of production decline.
The company notes that further capacity utilization will depend on the situation on the market, the key rate of the Central Bank, as well as the availability of leasing and credit instruments for customers.
At the current leasing rates of over 28%, improving leasing conditions remains the only effective anti-crisis mechanism for the light commercial vehicle segment.
As a reminder, in August, GAZ temporarily switched to a 4-day schedule due to the fall in the commercial vehicle market.
Read more on the topic:
Now on home
Герой России Гарнаев: никто из профессионалов о возобновлении производства на КАЗ всерьёз не говорит
Система отслеживает спутники на высотах до 50 000 км и ведёт за ними наблюдение
The armored vehicle is equipped with a KamAZ-740.35-400 diesel engine with a power of 400 hp.
Constant improvements in avionics, weapons and tactical capabilities will make the aircraft a flexible response to future challenges
The exterior of the KamAZ-54901 features fairings on the cab and chassis for fuel economy
Fighters are in demand both domestically and abroad
Tyazhpromexport and Venezuela Agree on Plant Revival
The company not only completed the state order, but also quickly mastered the production of AK-12K for special forces
Experts have developed a photogrammetric complex with a resolution of less than 1 cm