Cherekskaya HPP Commissioned: Grand Launch of the Hydroelectric Power Plant

A modern power supply station with a capacity of 23.4 MW is capable of producing 87 million kWh of energy

The grand launch of the Cherekskaya HPP, built by RusHydro, took place in Kabardino-Balkaria. The station with a capacity of 23.4 MW will annually generate 87 million kWh of clean energy, providing electricity to more than 25 thousand households.

Photo from the HPP launch event
Photo from the HPP launch event

Cherekskaya HPP has become part of the Nizhne-Chereksky cascade and is highly environmentally friendly. Designers from the Institute Hydroproject (part of RusHydro) developed the station to minimize the impact on the environment: its construction did not require flooding of land, and the water regime of the Cherek River remained unchanged.

All HPP equipment is made in Russia and meets modern standards. The installation was carried out by specialists from «Hydroremont-VKK» (part of RusHydro), which accelerated the commissioning of the station. Cherekskaya HPP operates within the framework of DPM-VIE (agreement on the provision of capacity for renewable energy sources), guaranteeing a return on investment.

Read more materials on the topic:

IT Park to Appear on Russky Island: A New Center for Microelectronics and Information Technology

Production of Heat Guns is Growing in Russia: 95% Localization, Unique Developments and Entry into New Markets

Import-Substituted Gear Developed by Specialists of the Scientific Institute: Rosneft is Actively Working to Replace Foreign Parts

Now on home