Preparation for the launch of the Progress MS-30 cargo ship continues at the Baikonur Cosmodrome. This was reported by the press service of Roscosmos State Corporation.
Specialists conducted an author's inspection and fairing encapsulation of the Progress MS-30 space truck. After the completion of these operations, the head section (consisting of the ship itself, the fairing, and the adapter section) will be delivered to the assembly and test facility of the 31st site for assembly with the launch vehicle.
The launch of the Soyuz-2.1a rocket with Progress MS-30 is scheduled for February 28, 2025.
Earlier www1.ru reported that the Progress MS-30 space truck was docked with the adapter section.
Read materials on the topic:
The Progress MS-30 space truck will be tested for leaks
Last maneuver: Progress MS-28 raised the ISS orbit before being sent into space
Now on home
Герой России Гарнаев: никто из профессионалов о возобновлении производства на КАЗ всерьёз не говорит
Система отслеживает спутники на высотах до 50 000 км и ведёт за ними наблюдение
The armored vehicle is equipped with a KamAZ-740.35-400 diesel engine with a power of 400 hp.
Constant improvements in avionics, weapons and tactical capabilities will make the aircraft a flexible response to future challenges
The exterior of the KamAZ-54901 features fairings on the cab and chassis for fuel economy
Fighters are in demand both domestically and abroad
Tyazhpromexport and Venezuela Agree on Plant Revival
The company not only completed the state order, but also quickly mastered the production of AK-12K for special forces
Experts have developed a photogrammetric complex with a resolution of less than 1 cm