Entrepreneur Ilya Goldaev from Primorsky Krai has created Russia's first industrial shredder for processing construction waste with a capacity of up to 50 tons per hour. This was reported by the press service of the regional government.
The domestic shredder can handle concrete, trees, and even dispose of an entire multi-story building.
The construction reinforced concrete waste remaining after the demolition of buildings can be processed by the shredder into secondary crushed stone, which is again suitable for use. Asphalt can be useful for the construction of new roads, and crushed brick can be used as a filler for concrete.
There are no analogues of machines with such productivity in Russia. I emphasize productivity, because our machine can process up to 50 tons per hour.
The project team was supported by the regional center "My Business". In 2024, the machine-building company was among the top three winners of the accelerator and received a certificate for state support in the amount of two million rubles.
Read more materials:
New Russian robot-cleaner will replace dozens of janitors
Hydrogen KamAZ "Chistogor" to be tested by the end of the year: new photos
Now on home
The service contains data on 45,000 fraudulent sites
Modernized engines may equip the Lada Azimut crossover
The price is 132 billion 265.8 million rubles
The manufacturer plans to strengthen its lineup of light commercial vehicles
The production of carbon fiber was organized in the shortest possible time
Electric vans will speed up the repair of urban transport infrastructure
Countries are working to synchronize regulations in the field of AI
The service's average daily audience is 55 million people
Stable Isomaterial Based on Metakaolin Has a Density Below 300 kg/m³
Re-identification quality improved twofold with new DynaMix method
Russians will be able to find out about debts online