"Uralturbo" (part of Gazprom Energoholding Industrial Assets) has created a manufacturing technology and started production of the power turbine housing for the TM16 engine. The new engine will replace imported analogues at Gazprom facilities.
The production and testing of the new TM16 marine gas turbine engine is scheduled to be completed by the end of 2025.
It is worth noting that the plant has already mastered the production of spare parts for steam and gas turbines, as well as more than 200 types of turbine blades for stationary gas pumping units (GPU). Also, JSC "URALTURBO" modernizes rotors, HP-LP cylinder casings, air and gas diaphragms.
Earlier www1.ru reported that UEC produced 700 VK-2500 engines for the Ka-52 Alligator in 2024.
Read materials on the topic:
Flight tests of the Russian aircraft engine VK-650V have begun
Now on home
The service contains data on 45,000 fraudulent sites
The state has accelerated the introduction of unmanned solutions, integrating them into the real sector of the economy
Modernized engines may equip the Lada Azimut crossover
The price is 132 billion 265.8 million rubles
The manufacturer plans to strengthen its lineup of light commercial vehicles
The production of carbon fiber was organized in the shortest possible time
Electric vans will speed up the repair of urban transport infrastructure
Countries are working to synchronize regulations in the field of AI
The service's average daily audience is 55 million people
Stable Isomaterial Based on Metakaolin Has a Density Below 300 kg/m³
Re-identification quality improved twofold with new DynaMix method
Russians will be able to find out about debts online